Manufacturing Capabilities

Capability here means what the floor can hold, not what a brochure lists: 220 machines on 5,000 m² at Shajing, 100 of them 5-axis, 50 CNC 46-series lathes and 70 Tsugami sliding-head lathes. Standard tolerance ±0.005 mm, MOQ 1 piece, prototypes 3–7 days, batch production 7–15 days. ISO 9001:2015 and ISO 14001:2015, every lot measured on a CMM.

CHX Precision Metal operates 220 CNC machines in our 5,000㎡ facility in Shenzhen Bao'an Shajing. Our equipment line covers 5-axis machining, precision turning, Swiss-type lathes, and in-house quality inspection. The factory covers 5,000 m2 and produces up to 5 million precision parts per month.

Equipment Lineup

CategoryBrand/ModelQuantityCapability
5-Axis Machining Center5-axis simultaneous, 30 of them 3+2100±0.005 mm
CNC Lathe46 series, bar stock only50Ø20–46 mm bar on 50 46-series lathes (Ø46–300 mm by review), ±0.005 mm
Swiss-Type LatheTsugami sliding-head70Ø1–20 mm, complex small parts
Total220 machines on 5,000 m²5 million pieces per month
CHX Precision Metal CNC production floor

Matching the Part to the Machine

The equipment list only matters if it maps to a part envelope. Below is how a drawing is routed on our floor: the envelope and batch size decide the line, and the line decides the setup count, which is what actually drives cost.

Part envelopeTypical batchLine usedWhy that line
Ø1–20 mm, turned from bar1,000–500,000Tsugami sliding-head (70 units)Guide bushing supports the work within 1 mm of the cut, so thin walls hold in one pass and secondary turning is usually unnecessary
Ø20–46 mm, turned from bar500–200,00046-series CNC lathe (50 units)Bar-fed, no blank preparation, one chucking per side
Ø46–300 mm, chucked50–20,000CNC lathe, chuck work (by review)Above bar capacity, quoted after a review of blank cost and swing
Prismatic, up to 3 faces100–50,0003-axis VMCLowest cost per part when no compound angle is involved
Prismatic, 5 faces or compound angles50–20,0003+2 machining centre (30 of the 100 units)Positioned indexing keeps one setup where a 3-axis machine needs three
Free-form surfaces, walls under 1 mm20–5,000Simultaneous 5-axis (100 units in total)A continuous tool vector avoids the witness marks and chatter that step-over leaves on thin sections

Two routing rules follow from this. A part that fits a sliding-head machine is almost never cheaper on a lathe with a chuck, because the bar stock and the guide bushing remove both the blank and the second operation. A part that needs a compound angle is almost never cheaper on 3-axis with multiple fixtures, because fixture error stacks across setups and shows up as position tolerance on the finished part.

One Part Family, Three Lines

A 316L VCR fitting set shows how that routing logic behaves on a real order, because a set is not one part. It is a short gland, a long gland, a nut, a gasket, and where the run turns, an elbow or a tee. Each of those leaves the floor as its own process stream, and the set only comes back together at cleaning, inspection and packing.

VCR set components and the line each one runs on
ComponentLine usedWhy it lands there
Short glandGang-tool latheShort and rigid, one setup, and the batch size justifies a fixed tool layout rather than repeated program changes
Long gland, nut, gasketCNC turning centreThread and seal face are cut in the same chucking, so the two features cannot drift apart between operations
Elbow, tee3-axis VMC, 3+2 where port faces sit off-axisThe bore breaks into the thread at an angle a single-point tool cannot reach, so it is milled and deburred at the intersection
316L VCR fitting set: glands, nuts and gasket

None of this set goes on the sliding-head machines. A VCR component is mostly thread and seal face, and a guide bushing buys nothing on that geometry; the gang-tool lathe and the turning centres are where it belongs, and the elbows are a milling job from the first operation.

Two bore sizes are in production, 1/4" and 1/2", all 316L including the nut and the gasket. Electropolishing is carried out by a qualified subcontract partner rather than in house, so that step is quoted inside the lead time. The family is supplied to equipment builders and gas-line integrators on long-term programmes from 10,000 sets, and a single component from a set can be ordered on the same volume basis. It is not listed on B2B marketplaces, because the price follows the drawing and the programme rather than a cart.

Quality Assurance

Every part is inspected on a CMM. Our quality management system is certified to ISO 9001:2015, with ISO 14001 environmental certification. Measurement reports, PPAP documentation and first-article samples are available on request. Production capacity reaches 5,000,000 parts per month, supporting long-term contracts at fixed pricing.

What Gets Measured, and How Often

Inspection is scheduled by feature criticality, not applied uniformly. A cosmetic bracket and a valve body do not need the same sampling, and charging them the same inspection cost would be wrong in both directions.

CheckFrequencyEquipmentRecorded as
First article, full dimensionalEvery new part number and every revisionCMMDimensional report with the shipment
Critical dimensions in processFirst piece after each setup changeCMM or height gaugeSetup sheet sign-off
In-process sampling, running lotPer drawing or per agreed AQLCMM, callipers, pin gaugesLot record, retained
Surface roughnessOn parts with a Ra calloutRoughness testerValue per drawing zone
Thread and tapped holes100% on critical threads, sampling otherwiseThread gaugesGo / no-go result
Visual and burr100%Bench inspectionDefect code, if any
Material and finish traceabilityEvery lotMill certs, finish pass-offEN 10204 3.1 on request; finish thickness report

Every shipment carries a dimensional report for the features on the drawing. If a feature is not on the drawing, we will not invent a tolerance for it — send the requirement and it becomes a controlled characteristic.

Lead Times & Delivery

Prototypes: 3-7 working days. Series production: 7-15 days, up to 20 days including surface treatments. Worldwide shipping via DHL/FedEx with anti-corrosion packaging and dedicated trays for precision components. Full lot traceability from raw material to shipment.

How the 3–7 Day Prototype Window Is Built

The prototype lead time is a schedule, not a promise. It assumes the drawing is complete on day zero: material, tolerance, surface finish and quantity all stated. A drawing that arrives without those is quoted the same day but starts the clock later.

DayWhat happensWhat can delay it
0–1Drawing review. We flag features that cannot be held at the stated tolerance, or that need a different process.Missing material spec, undefined datum scheme, tolerance tighter than the process can hold
1–2CAM programming, tooling set-up, material cut to length.Material not in stock locally — 7075 and titanium plate are the usual culprits
2–4First-piece machining on the routed line.Fixture design for a thin or awkward part
4–5CMM inspection against the drawing, first-article report drafted.A dimension out of tolerance needs a re-cut, which restarts the machining step
5–7Surface finish if specified, then packing.Anodising colour matching and hard anodising add 3–7 days on their own, outside this window

Batch production runs 7–15 days after first-article approval, and the clock for that is the approval date, not the order date. Shipping is EXW Shenzhen — we are happy to recommend freight forwarders, but the freight contract is yours.

Why CHX Precision Metal

CHX Precision Metal operates a 220-machine production facility in Bao'an, Shenzhen: 100 Taikan T600 machining centres (30 of them 3+2 five-axis), 50 CNC 46-series lathes and 70 Swiss-type automatic lathes. We work directly without intermediaries — from DFM review to scheduled Kanban deliveries. RFQ responses within 24 hours, including manufacturability feedback and cost optimization.

Frequently Asked Questions

What is your MOQ?

We accept orders from 1 part for prototypes; for series production, lots from 100 pieces are most economical, with annual fixed pricing for high volumes.

Can you work from our drawings?

Yes — we accept STEP, IGES, DWG and PDF. Our engineers review manufacturability and respond to your RFQ within 24 hours.

What are your lead times and how do you ship?

Prototypes: 3-7 working days. Series production: 7-15 days, up to 20 days including surface treatments. Worldwide shipping via DHL/FedEx with anti-corrosion packaging and dedicated trays for precision components. Full lot traceability from raw material to shipment.

Send your drawing, get a price in 24 hours

Name, email and what you need. Attach a drawing if you have one — STEP, PDF, DXF or a photo of the print. We reply with unit price, MOQ and lead time, usually within one working day.

Prefer email? Send drawings to mc@chxmetal.com.