CNC Machining Supplier for European Buyers
For European buyers, CHX Precision Metal supplies CNC machined and Swiss-type turned parts with EN 10204 3.1 material certificates, RoHS and REACH documentation, and FOB Shenzhen shipping into the EU. Parts are held to plus or minus 0.005 mm on 220 in-house machines in Shenzhen; prototypes take 3 to 7 days and production 7 to 15 days, with no minimum order for first articles.
CHX Precision Metal (Shenzhen Changhexin Precision Hardware Co., Ltd.) manufactures custom CNC machined and Swiss-type turned parts for European companies — RoHS- and REACH-aware, documented with EN 10204 3.1 certificates, and shipped EXW Shenzhen to the EU.
Why European companies source CNC parts from CHX Precision Metal
European buyers come to CHX Precision Metal for documented, repeatable precision. We run 220 machines in-house — 100 CNC machining centres, 50 CNC 46-series lathes and 70 Swiss-type sliding-headstock lathes (Tsugami) — with 8 in-house inspection instruments including a CMM (Leyden), and a monthly capacity of up to 5,000,000 pcs.
Our quality system is ISO 9001:2015 certified (NOA1994293, valid to 2028-07-30) and our environmental system is ISO 14001:2015 certified (05126E02909R253, valid to 2029-09-29), both issued by NOA, an IAF Multilateral Recognition Arrangement member.
EU compliance: RoHS, REACH and material declarations
Parts are produced to be RoHS (2011/65/EU) and REACH (EC 1907/2006) aware. We supply material declarations and SVHC statements for the substances we control, and can source RoHS-compliant platings, anodizing and passivation on request.
Where a finished assembly must carry CE marking, we machine and document the components so your own conformity assessment is straightforward — the CE declaration itself rests with the entity that places the product on the EU market.
Metric drawings and EN / ISO / DIN standards
We work to metric (SI) drawings with GD&T to ISO 1101 and metric threads to ISO/DIN. Standard tolerance is ±0.005mm on critical features, verified by CMM and reported per batch.
Send a 2D PDF, a 3D STEP/IGES model or a physical sample; DFM feedback is returned with the quote. Sales support is available in English, German and Italian.
EN numbers on your drawing, AISI names on our shop floor
European drawings rarely say 304. They say 1.4301, or 1.4404, and the setter on this side of the world reads 304 and 316L. Most weeks that translation is harmless. The week it is not, a pallet of turned parts reaches Rotterdam with the wrong chemistry printed on the EN 10204 3.1 certificate, and nobody finds out until the customer's incoming inspection. So we read the EN number first and confirm the equivalent in writing before the bar stock is ordered.
| EN / Werkstoff | AISI / UNS | Typically machined into | Shop note |
|---|---|---|---|
| 1.4301 | 304 | housings, covers, sensor bodies | the default stainless. Not for chloride service. |
| 1.4307 | 304L | welded assemblies | low carbon, less carbide precipitation at the weld. |
| 1.4404 | 316L | medical handles, marine, food contact | 2–3% molybdenum. Survives washdown. |
| 1.4571 | 316Ti | exhaust-side and high-temp parts | titanium stabilised against sensitisation. |
| 1.4021 | 420 | shafts, valve stems | hardenable. Passivate after grinding or it rusts in the box. |
| 1.7225 (42CrMo4) | 4140 | crank shafts, gear blanks | pre-hardened 28–32 HRC still cuts cleanly. |
| 1.4542 | 17-4PH (630) | actuator pins, high-strength links | H900 condition eats carbide inserts. |
| EN AW-6082 | 6082-T6 | brackets, structural housings | the workhorse alloy on European drawings. |
| EN AW-7075 | 7075-T6 | fixtures, stiff brackets | strong, but anodising colour drifts between lots. |
| EN AW-2011 | 2011 | free-cutting turned pins | chips break beautifully. Corrodes if left wet. |
| CuZn39Pb3 (CW614N) | C36000 | turned connectors, terminals | the free-cutting brass everyone means. |
| CuZn37 (CW508L) | C27200 | contacts, lead-free parts | no lead, so it machines slower and gummier. |
Two pairs get confused often enough to be worth naming. 1.4021 is 420, but 1.4034 is closer to 420C than to 440C — if your drawing says 1.4034 and you expected 58 HRC, it will not get there, and 1.4125 is the grade you actually want. And 1.4301 and 1.4307 machine almost identically, so the substitution looks free until someone welds the part and the heat-affected zone starts to sensitise.
Tolerance does not change with the naming system: plus or minus 0.005 mm on critical features either way, checked on a CMM and reported per batch. Send the drawing in whichever system your engineering department uses and we will quote against the EN number, not against our guess at what it means.
Shipping and customs to the EU (EXW Shenzhen, EORI, VAT)
We quote EXW Shenzhen. We do not quote CIF or DDP: freight, insurance and clearance are arranged by the forwarder you nominate, and we provide the commercial invoice, packing list, HS codes and material certificates your broker needs, including your EORI number where required.
Air freight reaches major EU hubs in 6–9 days; sea freight runs 30–40 days for larger batches.
A UK order is not an EU order with a different address
Since the UK left the customs union, a shipment to Birmingham does not clear the way a shipment to Dublin does. Your company needs a GB EORI number, not the EU EORI you use for the continent, and the customs entry is filed in the UK CDS system. We have shipped both ways and the paperwork is not interchangeable.
UK VAT at 20% is due at import. On FOB Shenzhen it lands on your side, where a VAT-registered buyer reclaims it; we do not quote DDP, so no VAT is buried in our price. For goods under GBP 135 sold direct to a consumer the rules shift again, which is one reason we quote business-to-business only.
On product marking, UKCA replaced CE in principle, but the UK government still accepts CE marking for most machinery and electronics, and the position has moved more than once. Check with your own importer before you design the label — we machine and document the component, the marking decision is not ours to make.
British threads are no problem: BSP, BSPP, BSW, UNC and UNF all run on the same lathes as metric. Air freight to Heathrow or Manchester takes 5–7 days; sea freight into Felixstowe or Southampton runs 28–35 days.
What a sample costs to ship, and how we get paid
Terms are 30% by T/T with the order and 70% before dispatch. New customers sometimes ask for Net 30 and we decline, which is not suspicion — 220 machines and 250 staff mean the cash has to come back before the next bar stock order goes out. Established accounts that have paid on time for a year can discuss different terms.
A prototype shipped by DHL or FedEx reaches most of Europe in 3–5 days. Under 1 kg the freight typically runs EUR 25–40, billed at cost with the waybill attached. The sample charge itself is credited against the production order if you place one, so the only money genuinely at risk is the courier fee.
Letters of credit we only accept above USD 5,000. Below that the bank charges on both ends eat more than the margin on the parts, and you would be paying for a document trail that protects neither side particularly well.
Fixtures, drawings and who owns what
Soft jaws and fixtures we cut for your part do not get reused on somebody else's job. They sit labelled with your part number until the next run. If you want them shipped to you, we crate them and you pay the freight; if you want them scrapped when the programme ends, say so and we will confirm it in writing with photographs.
Drawings stay inside the company. We sign an NDA before receiving files if you prefer — there is a page on that at IP protection and NDA — and we do not send your models to outside processors. Finishing goes to vendors we have used for years, and they get the process spec, not the assembly drawing.
Lead times for European projects
Prototypes 3–7 days · production batches 7–15 days · surface treatment adds 3–7 days. Quotes are returned within 12 working hours and our engineers overlap with CET business hours.
Quality documents European customers expect
FAI report, CMM dimensional report, EN 10204 3.1 material certificates, batch traceability and material declarations are standard on request. IATF 16949 and ISO 13485 are not held.
In-house finishing covers anodizing, zinc and nickel plating, passivation, black oxide, powder coating and laser marking.
Frequently asked questions
Do you ship CNC machined parts to Europe?
Yes. We hand over to forwarders serving all EU and EFTA destinations, on EXW Shenzhen terms. Air freight reaches major EU hubs in 6–9 days; sea freight runs 30–40 days.
Are your parts RoHS and REACH compliant?
Parts are produced RoHS (2011/65/EU) and REACH (EC 1907/2006) aware, with material declarations and SVHC statements for the substances we control, supplied on request.
Can you work to metric drawings and ISO/DIN standards?
Yes. We work to metric (SI) drawings with GD&T to ISO 1101 and metric threads to ISO/DIN, holding ±0.005 mm standard tolerance verified by CMM.
How is customs and VAT handled for an EU order?
On FOB Shenzhen your forwarder arranges freight, insurance and clearance; we provide the commercial invoice, packing list, HS codes and EN 10204 3.1 certificates, and we put your EORI number on the documents when you supply it.
What is the lead time to Europe?
Prototypes 3–7 days, production batches 7–15 days, plus 3–7 days for surface treatment. Quotes are returned within 12 working hours.
Which certifications do you hold?
ISO 9001:2015 (NOA1994293) and ISO 14001:2015 (05126E02909R253), issued by NOA, an IAF MLA member. IATF 16949 and ISO 13485 are not held.
Request a quotation from Europe
Send your drawings for a DFM review and a FOB Shenzhen landed-cost quote.
Email: mc@chxmetal.com | WhatsApp: +86-181-3885-0989
Shenzhen Changhexin Precision Hardware Co., Ltd. (CHX Precision Metal) · Shajing Street, Bao'an District, Shenzhen, Guangdong, China · ISO 9001:2015 (NOA1994293) · ISO 14001:2015 (05126E02909R253)
WhatsAppSend your drawing, get a price in 24 hours
Name, email and what you need. Attach a drawing if you have one — STEP, PDF, DXF or a photo of the print. We reply with unit price, MOQ and lead time, usually within one working day.
Prefer email? Send drawings to mc@chxmetal.com.
Related reading