How to Get a CNC Machining Quote from China — in 24 Hours

Send a drawing · DFM feedback · Quotation within 24 hours · No strict MOQ

Send a STEP file with material, quantity and the dimensions you actually care about; a quote with DFM notes comes back within 24 hours on weekdays. (CHX Precision Metal, Shenzhen) Pricing is built per feature, not per kilogram — a ±0.005 mm bore costs more than a ±0.1 mm slot, and the quote itemises which is which.

Capability at a glance
Equipment220 CNC machines: 50 CNC 46-series lathes, 70 Tsugami Swiss-type lathes, 100 Taikan T600 machining centers (30 of them 3+2)
Tolerance±0.005 mm on critical dimensions; tighter on request, looser to ISO 2768-m
MOQ1 piece for prototypes; volume pricing in tiers, annual framework agreements available
Lead timePrototype 3–7 days; production 7–15 days; surface finishing adds 3–7 days
MaterialsAluminum 6061/7075/5052, stainless 303/304/316, brass H59/C360, titanium TC4, carbon steel 1045, D2/H13, PEEK/POM
Monthly capacity5,000,000 pieces; repeat jobs keep dedicated machines, tooling and gauges
Surface finishAnodizing (Type II/III hard, clear/black/olive), plating (nickel/zinc/gold/silver), powder coating, blasting, polishing, passivation, black oxide
InspectionCMM, optical comparator, roughness tester, hardness tester; first-article, in-process and final inspection

A useful quotation is more than a price: it tells you which features are difficult, which tolerances drive cost, and how fast the part can actually ship. CHX Precision Metal answers RFQs from a Shenzhen plant running 220 CNC machines, and returns pricing with manufacturability feedback within 24 hours.

What to send for an accurate quote

  • 3D model (STEP, IGES, X_T) or 2D drawing (DXF, DWG, PDF), ideally both
  • Material and surface finish
  • Quantity per order and annual volume
  • Critical tolerances and inspection requirements
  • Target lead time and delivery destination

If your drawings are confidential, we sign a mutual NDA before we receive them.

What drives the price of a CNC part

Unit price in CNC machining is set mainly by cycle time, material cost, tolerance and finish. Tight tolerances, hard materials and multi-stage finishing raise cost; so does low quantity, because setup is spread over fewer parts. Sharing an annual volume often lowers the unit price.

How our quotation process works

  • Step 1 — Send files: drawing, material, quantity, finish
  • Step 2 — DFM review: our engineers flag manufacturability and cost drivers
  • Step 3 — Quotation: price, lead time and documentation scope within 24 hours
  • Step 4 — Prototype: 3–7 days after approval, CMM-verified
  • Step 5 — Production: 7–15 days per batch, up to 5,000,000 PCS/month

Choosing between several quotes

When you compare quotations from different suppliers, look past the headline price: check the tolerance actually committed, whether CMM and material reports are included, the realistic lead time, and who signs a quality agreement. The cheapest quote is not a saving if the parts need rework.

The line buyers misread is the one that is not there. A quote with a price and a lead time but nothing about what happens when parts fail inspection is not comparable to one that says. Ask about the reject policy before comparing numbers, because a cheap quote with no rework commitment turns expensive the moment a hundred parts arrive out of tolerance.

Second thing worth checking: the tolerance in the quote versus the tolerance on the drawing. If the drawing says ±0.01 mm and the quote never repeats it, that usually means the number was priced as something looser.

Documentation and traceability

Our quotations state what is included — first-article inspection, CMM dimensional reports, EN 10204 3.1 material certificates and batch traceability — so there are no surprises after the order. Tell us in the RFQ which documents your end customer requires.

How to Get a CNC Machining Quote from China — in 24 Hours at CHX Precision Metal Shenzhen factory
How to Get a CNC Machining Quote from China — in 24 Hours at CHX Precision Metal Shenzhen factory

Frequently Asked Questions

Is there a minimum order quantity?

No strict MOQ — single prototypes through volume production are both welcome.

Can you sign an NDA before quoting?

Yes, we sign a mutual NDA before receiving your drawings.

What affects the price most?

Cycle time, material, tolerance, finish and quantity — sharing an annual volume usually lowers the unit price.

Send your drawing for a quote

Email: mc@chxmetal.com  |  WhatsApp: +86-181-3885-0989

DFM feedback + quotation within 24 hours · DFM feedback & quotation within 24 hours

Need a quote for CNC Machining Quote China?

Send the drawing on WhatsApp and a sales engineer replies within a few hours on working days (GMT+8). Photos, PDF and STEP files are all fine.

Chat on WhatsAppEmail mc@chxmetal.com

Prefer Chinese? WeChat / 微信: +86 181 3885 0989

WhatsApp

Send your drawing, get a price in 24 hours

Name, email and what you need. Attach a drawing if you have one — STEP, PDF, DXF or a photo of the print. We reply with unit price, MOQ and lead time, usually within one working day.

Prefer email? Send drawings to mc@chxmetal.com.

OEM, ODM, Rapid Prototyping & Low Volume CNC Manufacturing

CHX Precision Metal supports the full sourcing spectrum: OEM manufacturing built to your drawings, ODM engineering support for design-for-machining optimization, rapid prototyping in 3–7 days from 1 piece, and low volume to small batch runs of 10–5,000 pcs — all under the same ±0.005 mm process control we use for mass production.

Buying from CHX: T/T 30/70 · PayPal & L/C accepted · EXW Shenzhen · forwarder referral · NDA signed before drawings · dimensional inspection report with every shipment.

Related reading

EXW Shenzhen handover & landed cost to Europe

Read next

Related capability: Mass CNC production · aluminum housing CNC machining · CNC lathe mass production