RoHS and REACH Declarations for CNC Parts: What to Check
By CHX Metal Engineering Team · Published 2026-11-22
A RoHS declaration covers all 10 restricted substances under EU 2011/65/EU, measured per homogeneous material; a REACH declaration covers the SVHC candidate list at article level, above 0.1% by weight. We supply both per part number, backed by EN 10204 3.1 certificates and plating chemistry records, from MOQ 1.
Two questions, two different scopes
RoHS and REACH arrive in the same email and get filed as one document, but they are two separate calculations with two different units of measure. RoHS 2011/65/EU, as amended by (EU) 2015/863, limits ten substances - cadmium at 0.01% by weight, the other nine at 0.1% - and it applies to each homogeneous material on its own: the base metal, the plating layer, the anodized film, the dye inside that film. REACH works on the article as a whole. Its Article 33 duty is narrower and blunter: if a substance on the SVHC candidate list is present above 0.1% by weight of the article, the customer must be told, in enough detail to allow safe use.
The gap between those two framings decides what any supplier can honestly sign. A part can be clean at homogeneous level and still carry an SVHC above the article threshold, or fail a single coating layer while the assembly as a whole measures far below 0.1%. “RoHS compliant” stamped on a drawing, with no scope and no revision date, is a sentence without a subject.
A declaration is per part number, not per company
The document that fails a customer audit is almost always the company-level PDF: a letterhead saying the factory complies with RoHS and REACH, dated two years ago, naming no part. It is not dishonest, just unverifiable - compliance is a property of a bill of materials, not of a building. When a customer asks us for a declaration, the first reply is a question back: which part number, and which finish.
A declaration that survives review carries four things:
- The part number and drawing revision it covers, plus the date of issue and a validity statement.
- The material, with the mill heat and the EN 10204 3.1 certificate behind it - the chemistry of the bar is the mill’s evidence, forwarded not re-tested, which is exactly how material certificates are meant to travel.
- Every finish layer listed separately with its process chemistry: passivation type, plating thickness, anodizing class and dye.
- Any exemption claimed, cited by its Annex III entry, not by a vague note that lead is “unavoidable”.
Where machining actually changes the answer
For most turned and milled parts the answer is decided before the stock reaches us, and only two areas move it.
The first is the base alloy. Lead is the substance that matters, and it enters through free-machining grades rather than through machining itself - leaded brass and leaded bronze carry lead percentages well above the 0.1% limit. Those alloys are only permissible through Annex III exemptions, which for copper alloy allow up to 4% lead, for steel 0.35% and for aluminium 0.4%. Those exemptions are time-limited and have been revised and re-argued repeatedly in Brussels, so the correct reference is the Annex III text in force on your shipment date, not a certificate issued in 2019. Free-machining stainless is the mirror case: 303 cuts freely because of sulphur, and sulphur is not a restricted substance, so 303 raises no RoHS question at all.
The second is the finish, which is where declarations actually go wrong. Hexavalent chromium in chromate conversion coatings is the classic failure; trivalent processes replaced it years ago on most lines, but “most” is not “all”, and the declaration has to name which one ran on your lot. Anodizing brings its own file: the film is aluminium oxide, harmless in itself, while the dye and the sealer are separate homogeneous materials that a finisher must declare. Nickel plating sits outside RoHS and is governed instead by a REACH Annex XVII restriction on nickel release, which matters for skin-contact articles, not brackets.
What we can sign, and what we cannot
We machine metal; we do not melt it. So the honest split matters. What we own is everything we add or change: the coolant and its residues, which are washed and documented, the passivation and plating lines we buy from, and the marking ink if a part is laser-etched rather than marked by laser alone. What we forward is upstream - mill chemistry with the heat number attached - and we keep it filed with the lot card, so a compliance question raised two years after delivery can still be answered from paper.
What we will not do is sign beyond our scope. The candidate list has passed 240 entries and is updated twice a year; testing every one of them on every lot is not something a machine shop our size does, and a supplier claiming otherwise is describing a laboratory it does not have. We also cannot sign a declaration for your finished assembly, or cover your CE marking: for machined components we supply parts, not completed machinery, and the finished-product obligations sit with whoever puts the assembly on the market.
What to write in the RFQ
Two sentences in the RFQ prevent most of the back-and-forth. Ask for a RoHS 2011/65/EU and (EU) 2015/863 declaration per part number, and a REACH declaration against the SVHC candidate list current at the shipment date, with a note of any substance above 0.1% by weight - and if there is one, the SCIP data that the EU waste framework now expects. If your program requires material certificates, add EN 10204 3.1 in the same line; tolerances can stay at ISO 2768-m for unmarked dimensions while critical features hold ±0.005 mm. Asking at quotation gets a supplier who has thought about it; asking at the port gets a scramble.
What ships with the parts
Declaration packs are part of the price, not an add-on. Our plant in Shajing, Bao’an District has machined since 2013 - 220 machines: 100 machining centres with 30 of them 3+2, 50 CNC lathes, and 70 Tsugami Swiss-type units - with 100+ staff and capacity of 5 million pieces a month. We hold ISO 9001:2015 and ISO 14001:2015, work in 6061/7075 aluminium, 303/304/316L stainless, H59 brass, TC4 titanium and Kovar, take orders from MOQ 1, and ship prototypes in 3–7 days and production in 7–15. Shipping is EXW Shenzhen only - we are happy to recommend reliable freight forwarders.
| Field | CHX Metal |
|---|---|
| Location | Shajing, Bao'an, Shenzhen, China - 5,000 m² plant, 100+ staff, machining since 2013 |
| Equipment | 220 machines: 100 machining centres (30 of them 3+2), 50 CNC lathes, 70 Tsugami Swiss-type lathes |
| Tolerances | ±0.005 mm on critical features; unmarked dimensions to ISO 2768-m; CMM and optical measurement |
| MOQ | 1 piece |
| Lead times | Prototypes 3–7 days; production 7–15 days; capacity to 5 million pieces per month |
| Materials | 6061/7075 aluminium, 303/304/316L stainless, TC4 titanium, H59 brass, Kovar, engineering plastics |
| Quality | ISO 9001:2015 and ISO 14001:2015; EN 10204 3.1 certificates; RoHS and REACH declarations per part number; first-article reports |
| Shipping | EXW Shenzhen only - we are happy to recommend reliable freight forwarders. |
Machining capacity behind this article
- Equipment: 220 machines — 100 machining centres (30 of them 3+2), 50 CNC lathes, 70 Tsugami Swiss-type lathes.
- Tolerance: ±0.005 mm on critical features; anything unmarked defaults to ISO 2768-m.
- Volume: up to 5 million pieces a month; prototyping 3–7 days, production 7–15 days.
- Materials: 6061/7075 aluminium, 303/304/316 stainless, H59 brass, copper, TC4 titanium, carbon steel.
- Footprint: 5,000 m² in Shajing, Bao'an, Shenzhen; 100+ staff; founded 2013.
- Terms: EXW Shenzhen only — we are happy to recommend reliable freight forwarders.
Address: Building B, 3rd Floor, Haosan Maozhoushan Industrial Zone, Buyong Community, Shajing Street, Bao'an District, Shenzhen | Tel: +86-755-27427365 | Email: mc@chxmetal.com
Frequently asked questions
What is the difference between a RoHS and a REACH declaration?
RoHS limits ten substances - cadmium at 0.01%, the rest at 0.1% - and is measured on each homogeneous material separately, so the plating and the base metal are judged on their own. REACH applies to the article as a whole: if any substance on the SVHC candidate list exceeds 0.1% by weight of the article, the customer must be informed under Article 33. One document cannot answer both questions.
Does leaded brass comply with RoHS?
Not on the 0.1% limit alone - leaded free-machining brass usually sits above it, and it is only permitted through an Annex III exemption that allows up to 4% lead in copper alloy, 0.35% in steel and 0.4% in aluminium. Those exemptions are time-limited and get revised, so the reference that counts is the Annex III text in force on your shipment date. If your market does not accept the exemption, choose a low-lead or lead-free grade at quotation rather than after the first article.
Can you provide declarations for every part number on an order?
Yes - each part number gets its own declaration naming the material and heat, every finish layer with its process chemistry, and any exemption claimed with its Annex III entry. There is no minimum order behind it, since our MOQ is 1 piece, and the upstream mill chemistry travels as an EN 10204 3.1 certificate that we forward rather than re-test.
Do you test parts for SVHC substances?
No, and we say so plainly: the candidate list has passed 240 entries and is revised twice a year, and a machine shop of our size does not run that testing in-house. What we do is carry the mill's chemistry, hold the declarations for the plating and passivation lines we use, and file all of it with the lot record so it can be traced back years later. Where a program needs laboratory screening, we arrange it as a separate item.
Does a part declaration cover our finished product's CE marking?
No. We supply machined components, not completed machinery - the CE or UKCA obligations for the finished assembly rest with whoever places it on the market. What we provide is the component-level evidence that feeds your technical file: material certificates, substance declarations and the inspection report described on our FAI and PPAP page.
Send your drawings for a DFM review and a quotation