Shenzhen CNC Factory | Precision CNC Machining
A factory rather than a trading office: 5,000 m² in Shajing, Bao'an, 220 machines, and the people who quote the part sit in the same building as the people who cut it. (CHX Precision Metal, Shenzhen) ISO 9001:2015 and ISO 14001:2015. Visitors walk the floor most weeks — bring the drawing and see it set up.
CHX Precision Metal (Shenzhen Changhexin Precision Hardware) is a Shenzhen CNC factory providing 5-axis machining, turning and surface treatment with ±0.005mm tolerance. ISO 9001:2015 certified. The factory covers 5,000 m2 and produces up to 5 million precision parts per month.
Factory Strength
- 220 machines
- 100 Taikan T600 machining centers
- 50 CNC 46-series lathes
- In-house surface treatment
220 machines is a count, not a capability. The split that matters is 100 machining centres (30 of them 3+2 five-axis), 50 CNC lathes and 70 Tsugami Swiss-type lathes, plus a CMM room that decides whether a batch leaves. Two shifts most weeks; a third when a pilot and a repeat order land together.
Services
- Rapid prototyping (1–50 pcs)
- Pilot runs (100–1000)
- Mass production (1000+)
- Assembly and finishing
Prototyping, pilot runs and volume differ less in the machine than the paperwork. A fifty-piece run ships with a dimensional report; a thousand adds first-article inspection; volume adds CpK on the dimensions you name. MOQ is one piece, and the price steps down rather than falling off a cliff.
Advantages
Shenzhen's supply chain enables fast turnaround, competitive cost and integrated finishing.
The Shenzhen advantage is narrower than brochures say. Anodizers, heat treaters and forwarders sit 30 minutes out, so a rework loop costs a day rather than a week. That is the whole. Drawings and tolerances are the same work they would be anywhere.
Quality
ISO 9001:2015 / ISO 14001 certified, CMM inspected.
A CMM report covers the dimensions on your print, not the ones nobody thought to tolerance. Where fit matters more than the individual part, send the assembly drawing and we check the stack-up before the first cut. Material certificates come as EN 10204 3.1 when the mill issues them, and when it does not...
Frequently Asked Questions
What makes Shenzhen good for CNC?
Mature supply chain, fast lead times, competitive pricing and integrated finishing.
What is your lead time?
Samples in 3-7 days and production in 7-15 days; finishing adds 3-7 days. Volume releases are scheduled against your delivery window.
What certifications?
ISO 9001:2015 and ISO 14001.
What is your capacity?
220 machines supporting prototyping to millions of parts per month.
Where exactly are you located?
Shajing, Bao'an District, Shenzhen, Guangdong - 20 minutes from Shenzhen Bao'an International Airport and about one hour from Yantian Port.
Can I visit the factory?
Yes, factory tours are welcome. We can arrange pickup from Shenzhen airport or your hotel, and prepare a line walk with our engineering team.
Get a Quote → Upload your drawing/3D model for a process plan and quotation within 24 hours.
Location Advantage
Our factory sits in Shajing, Bao'an District, Shenzhen, in the middle of the Greater Bay Area electronics and robotics supply chain. Material suppliers, anodizing partners, and freight forwarders are all within 30 minutes, which compresses lead time and logistics cost. Shenzhen Bao'an International Airport is 20 minutes away; Yantian and Shekou ports about one hour.
Capability Summary
3/4/5-axis milling, CNC turning (Ø1–20 mm Swiss, Ø20–46 mm bar; Ø46–300 mm by review), Swiss-type machining, surface treatment coordination, accuracy to ±0.005mm, and a coordinate measuring machine (CMM) for verification. ISO 9001:2015 and ISO 14001:2015 certified.
Quality You Can Audit
Every order ships with in-process inspection records. Our CMM verifies critical dimensions against your drawing on first article, at batch start, and at final release. Material certificates (EN 10204 3.1) and full dimensional reports come standard; PPAP and FAIR documentation are available on request for automotive and industrial programs.
Visiting & Logistics
Standard lead time is 3-7 days for prototypes and 7-15 days for production batches, with surface treatment adding 3-7 days. Parts are cleaned, protected against corrosion and scratching, and packed in customized trays or EPE foam for international shipping. DFM feedback on RFQs is returned within 24 hours.
Why Work With Us
One supplier from drawing to finished part: milling, turning, 5-axis and Swiss-type machining are all in-house, together with anodizing, plating, laser marking, and silk-screen coordination. You get one accountable partner instead of a chain of subcontractors.

Send your drawing, get a price in 24 hours
Name, email and what you need. Attach a drawing if you have one — STEP, PDF, DXF or a photo of the print. We reply with unit price, MOQ and lead time, usually within one working day.
Prefer email? Send drawings to mc@chxmetal.com.