Batch Aluminum Cavities for US Buyers: Cost, Tolerance, and China Machining

By CHX Metal Engineering Team · Published 2026-11-22

For a batch aluminum cavity, volume decides the process before the drawing does: at tens of pieces a machined plate blank wins, at thousands a die-cast or extruded blank with a second machining operation often does. Ask the shop how it holds datum across the run and what it measures after unclamping. We hold ±0.005 mm on critical features, report FAI, and ship EXW Shenzhen.

What a US batch-cavity RFQ actually contains

The RFQs that reach us from the States for an aluminum cavity rarely look like a prototype enquiry with a zero added. They arrive as a PDF drawing, an annual quantity, a first-order quantity, and a line about expected release dates. The annual number matters more than the first order, because it tells the shop whether to quote a fixture that will still be in use in eighteen months or a setup that just gets the first batch out.

A cavity is not a flat plate with a pocket. It usually has a sealing face, a set of bores that locate something else, walls that get thin where a cavity meets a mounting boss, and an finish requirement that decides whether the inside gets anodised, beaded, or left bare. Each of those is a separate line in a real quote. When a buyer asks why two quotes for "the same housing" differ by a third, the difference is almost never the machining rate — it is which of these lines each shop assumed.

Volume decides the process before the drawing does

A cavity cut from solid 6061 plate is the honest answer at low and medium volume. The blank is available, the material is predictable, and a change to the drawing costs a program revision rather than a tool. But a deep pocket in plate throws most of the stock away as chips, so cycle time — and cost — follows how much aluminum has to leave. At a few hundred pieces that is usually still the cheapest route once tooling is accounted for.

Past a thousand pieces a year the arithmetic starts to favor a near-net blank: an extrusion cut to length, a forging, or a die casting that arrives close to shape and needs only the sealing face, the bores and the critical cavities finished by CNC. The die itself is expensive and the lead time is longer, but per-part machining drops sharply because there is less material to remove and the blank is already consistent. The crossover is not a fixed number — it depends on wall thickness, the alloy, and how much of the surface is functional. Our note on batch production economics covers the setup and tooling side of that decision. The point for a buyer is to ask which blank the quote assumes, because two shops quoting the same drawing against different blanks are not really competing.

Why the cavity moves, and how a shop holds it

The classic cavity failure is a housing that measured fine at the machine and drifted after it came off. Two things cause it. The first is clamping: squeeze a thin wall at the vise, cut it to size, release it, and it springs into a shape nobody programmed. The second is stress in the blank — a plate with internal tension bows once a deep pocket removes the skin that was holding it flat. Our note on small-batch aluminum housing machining goes into the fixturing detail. The short version for a buyer is that the number measured while a part is clamped is not the number that ships.

A shop holding a batch properly does three things: it uses supports and contact points that do not distort the wall, it leaves the part to settle between roughing and finishing, and it measures again after the part is free. On a long run it also watches tool wear, because a cavity cut with a fresh tool and one cut three hundred pieces later are not the same size. This is a process question more than a machine question, and it is the single most useful thing to ask a supplier before a PO: how do you hold datum across the batch, and when do you measure — clamped or free?

Anodising, sealing faces, and the fit that disappears

Aluminum cavities are usually anodised for corrosion resistance and appearance, and that coating has a dimension. A Type II film around 10 µm nominal grows roughly half outward and consumes half beneath, so a bore can come back about 10 µm smaller on diameter; hard anodising at 25–50 µm multiplies that. On a sealing face this is not cosmetic — a bore that was a clean slip fit before anodising can need a press after. The drawing has to say which faces are functional and which are decorative, and the shop has to cut the functional ones with the growth already allowed for. We set this out in the 6061 anodising guide.

Colour is the other quiet variable. The same alloy dyed the same shade will not match across two anodising runs with different current densities, so a housing and its cover anodised in separate batches can land visibly different. If the assembly is cosmetic, ask for the parts to be racked together in one run and say so on the PO. It costs nothing to specify and is painful to correct after the parts arrive.

What the tolerance and the report can actually prove

We hold ±0.005 mm on critical features, with unmarked dimensions to ISO 2768-m. That number is real, but it is worth being precise about what it means on a batch cavity. A tolerance is a permission to vary within a band, not a promise that every part is identical. What a buyer should want from a supplier is evidence that the process sits inside the band across the run, not just that the first article passed — which is why we report as described on our inspection and FAI reporting page.

For a first US order the useful package is modest: a first-article inspection against the drawing, the material certificate with a heat or lot number that traces back to the blank, and a dimensional report in the units the buyer uses. If the drawing is in inches, ask for the report in inches. We covered the unit and callout traps that cost us a plate once in a recent note on reading a CNC quote. What a machine shop cannot certify is the performance of the finished assembly — leak rate under your seal, thermal behaviour in service, or regulatory approval. Those belong to the buyer's test bench.

FieldCHX Metal
LocationShajing, Bao'an, Shenzhen, China — 5,000 m² plant, 100+ staff, machining since 2013
Equipment220 machines: 100 machining centres (30 of them 3+2), 50 CNC lathes, 70 Tsugami Swiss-type lathes
Tolerances±0.005 mm on critical features; unmarked dimensions to ISO 2768-m; CMM and optical measurement
MOQ1 piece
Lead timesPrototypes 3–7 days; production 7–15 days; capacity to 5 million pieces per month
Materials6061-T6 and 7075-T6 aluminium, 2024 on request, 303/304/316L stainless, TC4 titanium, H59 brass; ISO 9001:2015 and ISO 14001:2015 certified
ShippingEXW Shenzhen only — we are happy to recommend reliable freight forwarders.

Vetting the supplier, and getting the parts home

Distance makes the basics worth checking rather than assuming. A video walk-through of the floor, the business licence and unified social credit code, the current ISO certificates, and a reference to a similar cavity shipped to the US are all reasonable to ask for before a first PO. Our shop-audit checklist and material-certificate guide set out what each document does and does not prove. What matters is not a long certificate list but whether the shop can explain, in specific terms, how it will hold your cavity flat and within tolerance across the quantity you ordered.

On shipping we quote EXW Shenzhen only and are glad to recommend a freight forwarder; we do not build freight and duty into the unit price, because a forwarder chosen by the buyer is almost always cheaper than one buried in a supplier's margin. Our tariff and DDP guide explains the options. One practical note: for a batch of cavities, confirm the packing before the quote is accepted. A part that is dimensionally perfect but arrived with a nick on the sealing face because it rubbed a neighbour in a crate is a loss neither side wants, and it is easy to prevent with dividers and a little more carton.

Machining capacity behind this article

Address: Building B, 3rd Floor, Haosan Maozhoushan Industrial Zone, Buyong Community, Shajing Street, Bao'an District, Shenzhen  |  Tel: +86-755-27427365  |  Email: mc@chxmetal.com

Frequently asked questions

At what quantity should I move from a plate blank to a cast or extruded blank?

There is no single cutoff. A machined plate blank is usually most economical at tens to a few hundred pieces, because there is no tooling and a drawing change costs only a program revision. Past roughly a thousand pieces a year, a near-net extrusion, forging or die casting starts to pay back its tooling through shorter cycle time and less waste. The crossover depends on wall thickness, alloy and how much of the surface is functional, so ask the shop to quote both routes at your annual volume before deciding.

Why did my housing measure correctly at the factory but drift after arrival?

Usually clamping or blank stress. A thin wall squeezed in a vise springs back after release, and a plate with internal tension bows once a deep pocket removes the outer skin. A shop holding a batch properly supports the wall, lets the part settle between roughing and finishing, and measures again after unclamping. Ask whether the dimensional report was taken while the part was clamped or free.

Does anodising change the fit of a bore in an aluminum cavity?

Yes. A Type II film near 10 µm nominal grows roughly 5 µm outward and consumes about the same beneath, so a bore comes back roughly 10 µm undersize on diameter; hard anodising at 25–50 µm multiplies that. The drawing should mark which bores are functional fits so the shop can cut them undersize by the expected growth, and functional faces should be masked or chased as needed.

What inspection should I ask for on a first batch from China?

A first-article inspection against the drawing, a material certificate with a heat or lot number traceable to the blank, and a dimensional report in the units on your drawing. On critical features we hold ±0.005 mm and report as described on our inspection and FAI page. A dimensional report proves the part meets the drawing; it does not prove your assembly's leak rate or service behaviour, which belong to your own test bench.

What are the shipping terms and can you include freight in the price?

We quote EXW Shenzhen only and are happy to recommend reliable freight forwarders; we do not build freight and duty into the unit price, since a forwarder you choose is usually cheaper than one added to a supplier's margin. Our tariff and DDP guide explains the options. Confirm the packing for a batch of cavities so sealing faces are separated and protected in transit.

Send your drawings for a DFM review and a quotation

STEP, IGES, DXF, DWG or PDF — note the material, quantity and finish. Quotes usually go back within one working day. Email mc@chxmetal.com or use the quote form.