CNC Batch Production | High-Volume CNC Machining
Runs from 100 to over a million pieces, on automated lines with bar feeders and pallet changers. (CHX Precision Metal, Shenzhen) Consistency comes from measuring in process rather than inspecting at the end: Cpk above 1.33 is what we report on critical dimensions. ±0.005 mm, first production batch in 7–15 days.
Capability at a Glance
| Item | Specification |
|---|---|
| Swiss-type turning | Ø1–20 mm, length ≤200 mm, ±0.005mm |
| CNC turning | Ø1–46 mm bar (Ø46–300 mm by review), length ≤600 mm, ±0.005mm |
| Turn-mill (one setup) | Ø5–200 mm, ±0.005 mm |
| 5-axis milling | up to 1000×600×500 mm, ±0.005 mm |
| Machines | 220 (100 Taikan T600 machining centres, 30 of them 3+2 five-axis + 50 CNC 46-series lathes + 70 Swiss-type) |
| Monthly capacity | 5,000,000 pcs |
| MOQ | 1 pc prototype / 100 pcs series |
| Lead time | Prototype 3–7 days / production 7–15 days |
| Materials | Al 6061/7075, SS 303/304/316L, brass C360, Ti TC4, PEEK, POM |
| Surface finish | Anodizing, sandblasting, Zn/Ni plating, passivation, black oxide |
| Quality system | ISO 9001:2015, ISO 14001:2015 |
CHX Precision Metal (Shenzhen Changhexin Precision Hardware) delivers CNC batch production from 100 to over 1,000,000 parts with consistent ±0.005mm quality via automated production lines. ISO 9001:2015 certified.
Batch Capability
- Volume 100 to 1,000,000+ parts
- Consistent ±0.005mm
- Automated production lines
- 220 production machines
Consistency Control
- SPC and in-process inspection
- First-article approval
- Tool life monitoring
- CMM spot checks
Industries
- Electronics
- Automotive
- Medical
- Industrial
Quality
ISO 9001:2015 certified with statistical process control for stable high-volume output.
Aluminum batch production from 500 to 50,000 pieces
Aluminum is the material we run in the highest volume, and batch work is where that matters. Of our 100 CNC machining centres, 30 are 3+2 positioned five-axis machines configured for aluminum, running housings, heatsinks, brackets, battery trays and automation fixtures every week. Batch aluminum is a different discipline from single-piece aluminum: the questions move from "can you make it" to "can you make the 8,000th identical to the first".
Three things decide whether an aluminum batch stays on budget. Setup count. Every additional setup adds a re-chuck error and a queue slot; a 3+2 machine that finishes five faces in one clamping removes both. Material yield. Nested bar or plate layout matters more than the unit price of the stock, and on a 2,000-piece bracket the difference between a 62% and a 74% yield is larger than the machining margin. Finishing logistics. Anodizing racks sized to the part, and one batch processed together, avoids colour mismatch across a reorder.
| Quantity | Setup strategy | Inspection | Typical production lead time |
|---|---|---|---|
| 500-2,000 | 3+2, five faces in one clamping; soft jaws cut to the part | First article with measured values, then AQL sampling per drawing | 7-15 days, plus 3-7 days for finishing |
| 2,000-10,000 | Dedicated soft jaws, pallet change to overlap load and cut | First article plus in-process check every 200-500 pcs depending on feature risk | 10-20 days in scheduled slots |
| 10,000-50,000 | Multi-part fixture or tombstone; cycle time balanced across spindles | First article, SPC trend on critical features, CMM audit per lot | Quoted against a capacity slot, not a standard lead time |
Two aluminum-specific risks scale with volume. The first is thermal: a batch machined in the morning and measured in the afternoon reads differently, so on anything carrying ±0.005 mm we measure in a temperature-stabilised room after the part has cooled, and the report states the condition. The second is burr consistency — the burr on piece 1 and piece 5,000 differ as the tool wears, so deburring is a defined process step with a check, not a bench operation left to feel.
Batch pricing is tiered: the same drawing quoted at 500, 2,000 and 10,000 pieces shows where the setup amortises and where material becomes dominant. Ask for all three tiers in one quote — it is the only way to see whether your target volume is on the right part of the curve. Minimum order is 1 piece, so the same line that runs the prototype runs the batch, with no process jump in between.
Frequently Asked Questions
What batch sizes can you handle?
From 100 pieces to over 1,000,000 parts per run with consistent quality.
How do you ensure consistency?
SPC, first-article approval, tool-life monitoring and CMM spot checks across automated lines.
What is your capacity?
220 production machines including 100 Taikan T600 machining centers and 50 CNC 46-series lathes.
Which industries?
Electronics, automotive, medical and industrial manufacturing.
Get a Quote → Upload your drawing/3D model for a process plan and quotation within 24 hours.
Materials We Process
Aluminum, steel, stainless, brass.
Scope of Service
- 100-10k piece batches
- repeat orders with stable tooling
Capability Highlights
Accuracy to ±0.005mm, first-article on every batch, verified on a CMM. Machine park includes 3/4/5-axis machining centers, CNC lathes and Swiss-type machines, with in-house fixture design and CAM simulation for first-pass success.
Quality System
Quality is verified, not assumed. First article inspection is mandatory on every new part number, and our quality engineers record CpK on critical dimensions for volume programs. With a coordinate measuring machine (CMM), surface roughness testers, and a temperature-controlled inspection room, measurement uncertainty is kept far below the tolerances we quote.
Lead Time & Packaging
Quotations with manufacturability feedback are returned within 24 hours of receiving your drawing or 3D model. Prototypes ship in 3-7 days; production orders run 7-15 days depending on quantity and finishing. Export packing uses anti-scratch film, VCI paper, or custom trays so parts arrive ready for your assembly line.
Why Customers Stay
Engineering support is included, not extra. Our CAM engineers review every drawing for manufacturability and cost reduction before quoting, and flag tolerance or finish decisions that materially affect price. Customers typically save 10-25% on program cost after this review.

For turned parts specifically, the volume route is the CNC lathe mass production cell: 50 lathes to Ø300 mm, 70 Swiss-type lathes, 5,000,000 pieces a month.
Engineering notes: From 1-Piece Prototype to 100,000-Piece Production
WhatsAppSend your drawing, get a price in 24 hours
Name, email and what you need. Attach a drawing if you have one — STEP, PDF, DXF or a photo of the print. We reply with unit price, MOQ and lead time, usually within one working day.
Prefer email? Send drawings to mc@chxmetal.com.
OEM, ODM, Rapid Prototyping & Low Volume CNC Manufacturing
CHX Precision Metal supports the full sourcing spectrum: OEM manufacturing built to your drawings, ODM engineering support for design-for-machining optimization, rapid prototyping in 3–7 days from 1 piece, and low volume to small batch runs of 10–5,000 pcs — all under the same ±0.005 mm process control we use for mass production.
Buying from CHX: T/T 30/70 · PayPal & L/C accepted · EXW Shenzhen · forwarder referral · NDA signed before drawings · dimensional inspection report with every shipment.