Small Batch CNC Machining in China: Where the Cost of a Short Run Actually Sits
Small batches run here from one piece, on 220 machines in Shenzhen. Prototypes take 3–7 working days and series lots 7–15. Most of the price of a short run is set-up and inspection rather than cutting time, so the way to make a small lot cheaper is to reduce set-ups, not to shop for a lower hourly rate.
Small-Batch CNC Machining: Key Facts
| Location | Shenzhen, China |
| Equipment | 220 CNC machines total: 100 five-axis (30 of them 3+2 configurations), 50 bar-fed CNC 46-series lathes, 70 Tsugami Swiss-type sliding-headstock machines (bar capacity Ø1–20 mm) |
| Tolerances | Standard ±0.005 mm regardless of lot size; tighter where the drawing calls for it |
| MOQ | 1 piece, tiered pricing by quantity |
| Lead times | Prototypes 3–7 working days; production lots 7–15 working days; surface treatment 3–7 days |
| Materials | Aluminum 6061/7075 · stainless steel 303/304/316L · brass C360 · titanium TC4 · Kovar · Invar · carbon steel · PEEK · acetal; any material specified on the drawing |
| Quality | Small lots inspected as first article plus sampling; series lots run under a control plan; dimensional inspection report with every shipment |
| Shipping | EXW Shenzhen only - we are happy to recommend reliable freight forwarders. |
What “small batch” means on this floor
Small is a relative word, and it hides the thing that actually matters: how many set-ups the job needs. One part with five faces is a bigger job than two hundred parts with one face. In practice, the enquiries that reach us as “small batch” fall into three groups, and they behave differently.
| Lot | What it usually is | What dominates the price | Typical lead time |
|---|---|---|---|
| 1–10 pieces | A prototype, a replacement part, a fixture for a line that is already running | Programming and the first-article inspection | 3–7 working days |
| 10–200 pieces | Pilot production, a first article run, a spares kit | Set-up plus material; cutting time starts to matter | 5–10 working days |
| 200–1,000 pieces | Low-volume production, a product that sells in tens per month | Cutting time and material, with set-up spread thin | 7–15 working days |
| Above 1,000 | Series production | Material and cycle time | 7–15 working days, call-off schedule by agreement |
Most of the enquiries we receive are under 1,000 pieces, which is not surprising: a machined component usually sits inside an assembly that is itself built in modest numbers. The floor is arranged for that reality rather than against it — turning lines and milling lines are separate, so a short turning job does not wait behind a long five-axis job.
Why the first fifty pieces cost what they cost
A short run carries a fixed cost that a long run spreads out. The fixed part is not a markup and it is not negotiable in the way buyers hope: it is real work that happens once regardless of how many parts follow it.
- Programming. A drawing becomes a toolpath. The time depends on the number of features, not the number of parts.
- Fixturing. Soft jaws, a dedicated plate, a support for a thin section. On a small lot the fixture can cost more than the parts.
- Tooling set-up and first-piece prove-out. The first piece is measured, adjusted and measured again. That loop is where a small lot earns its tolerance.
- First-article inspection. A CMM report with measured values against the drawing takes an inspector an hour or two, once, regardless of lot size.
- Material handling. Buying a bar or a plate, cutting it to length, booking it into the job.
- Outside operations. Heat treatment, anodising and plating carry their own minimum charges, which is why a small lot with three surface treatments looks expensive next to one with none.
The consequence is straightforward: if the per-piece price of a 50-piece lot is three times the price of a 5,000-piece lot, most of that difference is the fixed block divided by fifty instead of by five thousand. Asking a supplier to “do something about the price” on a short run is usually asking them to absorb the fixed block. The productive questions are different ones: can the number of set-ups come down, can a feature be relaxed, can the surface treatment be simplified.
What keeps a small lot affordable
The levers are structural, not commercial. They come from how the shop is arranged and how the part is designed, and most of them are available on the first conversation.
- Separate turning and milling lines. A turned part does not queue behind five-axis work. On a floor of 220 machines this is the single largest effect on short-run lead time.
- Sliding-head lathes for small diameters. 70 Tsugami machines cover Ø1–20 mm, and a shaft or a pin with a cross hole and a thread can finish in one pass with no second set-up.
- Standard workholding. If a part can be held in soft jaws rather than a dedicated fixture, the fixture cost disappears from the quote.
- One drawing revision. A drawing that changes after programming costs the programming twice. Freezing the drawing before the first cut is free money.
- Loose non-functional tolerances. A general tolerance note that covers the features nobody measures makes the job cheaper without making the part worse.
- Fewer surface treatments on one part. Two finishes means two outside operations and two minimum charges.
None of that requires a bigger order. It requires a drawing that has decided what matters.
When a small batch is the wrong answer
There are cases where a short run at a CNC shop is genuinely the expensive way to solve the problem, and it is more useful to say so than to quote it.
- The part is a simple shape in large numbers — stamping or die casting will beat machining by an order of magnitude once the tooling is amortised.
- The part is a prototype of a plastic housing — 3D printing or a soft tool is faster and cheaper than machining for a first look.
- The tolerance is loose enough that a saw-and-drill job would do — paying for a CMM report on a part nobody will measure is waste.
- The part needs a certificate we do not hold — we will say so at quotation stage rather than at audit stage.
- The volume is stated as small but is actually a forecast — quoting a pilot run at pilot prices and then being asked for the same price at ten times the volume is a conversation worth having early.
Being told which of these applies is worth more than a discount.
From prototype to series without changing supplier
The expensive thing about a new part is rarely the first lot. It is the second supplier. Moving from a prototype shop to a production shop means a new DFM conversation, a new fixture, a new first article, and a fresh set of questions about whether the process will hold at volume.
Here the prototype and the series run on the same floor, on the same machines, to the same tolerance. The prototype is made on the machine that will make the series part, which means the process is proven before the volume arrives and the first-article report from the prototype is a real predictor rather than a demonstration.
Standard tolerance across the floor is ±0.005 mm, tighter where the drawing calls for it. Every lot is measured on a CMM and a first-article report ships with the parts. Minimum order is one piece. Prototypes run 3–7 working days, batch production 7–15 working days, and up to 20 days including surface finishing.
Reading a small-batch quote, line by line
A quote for fifty pieces and a quote for five thousand pieces can look identical on the page and behave completely differently, because the same line items carry very different weights. Knowing which line to argue about is worth more than a percentage discount.
| Line on the quote | What it hides at 50 pieces | What to ask |
|---|---|---|
| Unit price | The fixed block divided by fifty, plus the part | “What does the price become at 200 and at 1,000?” The answer tells you whether the fixed block is real or padded |
| Set-up / programming | Usually already inside the unit price, so it is invisible | “Is there a separate set-up charge, and does a repeat order pay it again?” |
| Material | Often quoted with a scrap allowance that a small lot justifies and a large lot does not need | “What is the material cost per piece at this lot size?” |
| Tooling / fixture | Usually absorbed, occasionally quoted separately | “Is there a one-off fixture charge, and does it belong to us or to you?” |
| Surface finish | Carries an outside minimum charge that does not scale down | “Is the finishing quoted at the partner’s minimum, and what would a simpler finish cost?” |
| Inspection | First-article report is real work; sampling is not | “What is in the report, and is it measured values or a certificate?” |
| Freight | EXW means it is not on our quote at all | “Who books the forwarder?” The answer should be you, with our documents |
The two questions that change a small-batch price most are the lot-size ladder and the fixture ownership. Everything else is a few percent.
How a first order usually runs
- Drawing in, questions back. If the drawing has an ambiguity, it comes back before the first chip rather than after the first delivery. NDA on request.
- Quote with a lot-size ladder. One price for one part, one for the pilot lot, one for the series volume, so the economics are visible rather than argued about later.
- First article. The first piece is machined, measured on the CMM, and the report with measured values goes out for approval before the rest of the lot runs.
- Rest of the lot. Runs on the same machine, to the same set-up, so the first-article report predicts the lot rather than flattering it.
- Packing and documents. Packing list against the forwarder’s instructions, photographs of the packed lot on request, EXW Shenzhen.
- Repeat order. The programme and the fixture already exist, so the second order is shorter than the first. That is the point of keeping the same supplier.
A first order of fifty pieces is not a test of whether the shop can make fifty pieces. It is a test of whether the shop reads a drawing, answers a question, and reports what it measured. The second order is where the price becomes interesting.
Frequently asked questions
What is the minimum order for CNC machining?
One piece. There is no minimum quantity and no setup fee disguised as a minimum charge. A single part is quoted at the real cost of making one part, which is high per piece and honest about why.
Why is a 50-piece lot so much more per piece than a 5,000-piece lot?
Because the fixed part of the job — programming, fixturing, first-article inspection, material handling — is the same whether you make 50 or 5,000. Spread over 50 pieces it is a large number per piece; over 5,000 it nearly disappears. The cutting time per piece barely changes.
Can you hold a tight tolerance on a small batch?
±0.005 mm is our standard tolerance regardless of lot size, because the tolerance comes from the machine and the set-up, not from the volume. What changes with volume is process control: a small lot is inspected as a first article plus sampling, a large lot gets a control plan.
Do you charge for programming and fixturing separately?
No. They are inside the quoted piece price. What is quoted separately is anything that leaves the building for a partner — heat treatment, hardening and grinding, specialised surface finishing — because those are outside operations with their own minimum charges.
What is the most economical lot size here?
Series lots from 100 pieces are the point where the per-piece price stops falling steeply. Above that it is fairly flat until the volume justifies a dedicated fixture, at which point it drops again.
What are the shipping terms?
EXW Shenzhen only — we are happy to recommend reliable freight forwarders, but the freight contract stays with the buyer.