ISO Certified CNC Machining | Quality-Assured Manufacturing

Two certificates are held: ISO 9001:2015 and ISO 14001:2015. (CHX Metal, Shenzhen) No IATF 16949, no AS9100, no ISO 13485 — if an RFQ needs any of the three, we say so before quoting rather than after. What the 9001 system actually buys is a documented inspection trail from incoming material to final measurement.

Capability at a glance
Equipment220 CNC machines: 50 CNC 46-series lathes, 70 Tsugami Swiss-type lathes, 100 Taikan T600 machining centers (30 of them 3+2)
Tolerance±0.005 mm on critical dimensions; tighter on request, looser to ISO 2768-m
MOQ1 piece for prototypes; volume pricing in tiers, annual framework agreements available
Lead timePrototype 3–7 days; production 7–15 days; surface finishing adds 3–7 days
MaterialsAluminum 6061/7075/5052, stainless 303/304/316, brass H59/C360, titanium TC4, carbon steel 1045, D2/H13, PEEK/POM
Monthly capacity5,000,000 pieces; repeat jobs keep dedicated machines, tooling and gauges
Surface finishAnodizing (Type II/III hard, clear/black/olive), plating (nickel/zinc/gold/silver), powder coating, blasting, polishing, passivation, black oxide
InspectionCMM, optical comparator, roughness tester, hardness tester; first-article, in-process and final inspection

CHX Metal (Shenzhen Changhexin Precision Hardware) is ISO 9001 and ISO 14001 certified for CNC machining, providing full material traceability, CMM inspection and environmental management. ISO 9001:2015 certified. Operations are certified to ISO 9001:2015 and ISO 14001:2015, with CMM inspection on every batch.

Certifications

Two certificates, and neither is a marketing claim. ISO 9001:2015 covers the quality system, ISO 14001:2015 the environmental side. Both are audited annually by a third party and the certificates are on file with numbers, for any customer whose quality department wants to verify them before placing an order. We do not hold IATF 16949 or AS9100, and a program that needs either should hear that in the first email rather than after a sample run.

Quality Process

The process is not complicated. Incoming material gets checked against its certificate, first article gets a full CMM report before the run continues, in-process checks are set at a frequency that depends on how critical the feature is, and outgoing inspection is AQL sampling. On Swiss-type parts for consumer electronics the defect rate sits under 0.05%.

Traceability

Lot level, not serial level. Every shipment ties back to a material certificate, a machine, an operator and a date. Serial numbers on individual parts are possible, but that has to be agreed before the job is routed, because it changes how parts move through the shop and what the price looks like.

Why It Matters

Certified systems reduce defect risk and provide auditable quality records for regulated industries.

Frequently Asked Questions

Which certifications does CHX Metal hold?

ISO 9001:2015 and ISO 14001.

How do you ensure quality?

Incoming, first-article CMM, in-process and outgoing inspection with full traceability.

Do you provide inspection reports?

Yes. CMM reports and material certificates are provided on critical parts.

Why does certification matter?

It reduces defect risk and provides auditable records for medical, automotive and industrial.

Get a Quote → Upload your drawing/3D model for a process plan and quotation within 24 hours.

Materials We Process

ISO 9001:2015 and ISO 14001:2015 certified plant.

Scope of Service

Capability Highlights

Accuracy to documented process control, verified on a CMM. Machine park includes 3/4/5-axis machining centers, CNC lathes and Swiss-type machines, with in-house fixture design and CAM simulation for first-pass success.

Quality System

Every order ships with in-process inspection records. Our CMM verifies critical dimensions against your drawing on first article, at batch start, and at final release. Material certificates (EN 10204 3.1) and full dimensional reports come standard; PPAP and FAIR documentation are available on request for automotive and industrial programs.

Lead Time & Packaging

Standard lead time is 3-7 days for prototypes and 7-15 days for production batches, with surface treatment adding 3-7 days. Parts are cleaned, protected against corrosion and scratching, and packed in customized trays or EPE foam for international shipping. DFM feedback on RFQs is returned within 24 hours.

Why Customers Stay

One supplier from drawing to finished part: milling, turning, 5-axis and Swiss-type machining are all in-house, together with anodizing, plating, laser marking, and silk-screen coordination. You get one accountable partner instead of a chain of subcontractors.

ISO Certified CNC Machining equipment at CHX Metal Shenzhen factory
ISO Certified CNC Machining at our Shenzhen Bao'an facility

Engineering notes: FAI to Production: A Practical Inspection Plan

Need a quote for ISO Certified CNC Machining?

Send the drawing on WhatsApp and a sales engineer replies within a few hours on working days (GMT+8). Photos, PDF and STEP files are all fine.

Chat on WhatsAppEmail mc@chxmetal.com

Prefer Chinese? WeChat / 微信: +86 181 3885 0989

WhatsApp

Send your drawing, get a price in 24 hours

Name, email and what you need. Attach a drawing if you have one — STEP, PDF, DXF or a photo of the print. We reply with unit price, MOQ and lead time, usually within one working day.

Prefer email? Send drawings to mc@chxmetal.com.

Related reading

Inspection reports, FAI & PPAP

Read next

Related capability: Medical device parts CNC manufacturer